Repository navigation
feat(field): exercise live injection route configurations - #4317
Merged
Merged
Conversation
This was referenced Oct 13, 2026
EvenSol
marked this pull request as ready for review
October 13, 2026 12:19
EvenSol
added a commit
that referenced
this pull request
Oct 13, 2026
Consume the canonical live injection route and reservoir-boundary contract from #4317 in the persistent field workflow. Revalidate production and injection line-ups plus lifecycle pressure changes, withhold invalid intermediate configurations, and reconnect a later safe proposal to the latest superseded incumbent. Refs #4188, #3154, #4187, #2939, #4228
This was referenced Oct 13, 2026
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
Continue #4228 from merged #4314 by applying the same canonical multi-edge line-up contract to a live multi-zone water-injection network.
FieldNetworkTopology/LoopedPipeNetwork;WellFlowinjectivity, zone allocation and fracture-pressure checks;WellFlow.ReservoirLayer.setReservoirPressure(...)/getReservoirPressure(...)so lifecycle pressure changes keep the layer boundary and its owning stream synchronized;This adds no graph, hydraulic solver, injection-well model, optimizer, evidence store, schedule or cost abstraction.
Engineering behavior
The synthetic acceptance case starts from a 180 bara water source and one two-zone injector. It switches complete two-edge primary and brownfield paths and a four-edge redundant line-up through
configuration.injector route.selection. The live well remains the owner of injectivity, allocation and fracture evidence. Reservoir-pressure updates are delegated to each existingWellFlow.ReservoirLayer, which synchronizes its reservoir stream without modifying PI/II, fracture pressure, composition or the field graph.The evidence is implementation plus synthetic integration, conservation and monotonic lifecycle-trend validation. It is not injectivity, fracture, pump-map, outage, brownfield, field, laboratory or commercial-simulator qualification.
Validation
Exact published commit:
f7401f2b36aa0d5fdc7bd2fb9d6e1123de2fabb9Exact published tree:
611d8ea6c45421840052d734c308f15efc295074Base/master:
d27433c40ba52cd6d647462f3ba388f1a7fc8dcePassed locally:
FieldWellNetworkProcessUnitTest(6)FieldWellNetworkCouplerTest(10)FieldNetworkScaleAcceptanceTest(3)WellFlowTest(6)OutOfZoneInjectionTest(24)ProcessAutomationTest(101)--check(3,376 public types);git diff --check.Local Javadocs remain blocked by the runtime's missing
javadocexecutable. The localpre-commitexecutable is absent; mandatory direct gates passed. Exact-head hosted CI is pending and no hosted validation is claimed yet.Documentation impact
Updated the SURF integration guide and pipeline/network skill with live injection line-ups, synchronized reservoir-layer pressure updates, evidence boundaries and the revised dependency order. Generated engineering coverage was refreshed.
Coordination and stop boundary
Next dependency
Scale the same live production/injection and route-configuration contract to qualified pump/compressor maps, shared host power/capacity constraints and multi-period lifecycle evidence. Independent thermal, ST-F101 and F109 qualification remains separate.
Refs #4228, #4188, #3154, #2911, #3298, #3153, #2899, #1332.